PWA83123: FIXTURE,MACHINING,AIRCRAFT ENGIN.
FIXTURE,MACHINING,AIRCRAFT ENGIN. Key specifications include functional_description: SUPPORT THE SIXTH STAGE TURBINE DISK WHILE ITS STUB SHAFT DIAMETER IS MACHINED BEFORE AND AFTER PLASMA SPRAY, nominal_overall_height: 7.600 INCHES IN, end_item_identification: C-17 AIRCRAFT ENGINE F117-PW-100, nominal_overall_diameter: 31.500 INCHES IN, reference_data_and_literature: SERD 0500. This part is cataloged in the U.S.
Government catalog under NSN 4920-01-394-1267, indicating validated use in U.S. government and defense logistics supply chains. Available through authorized enterprise resellers and TPM (Third Party Maintenance) channels.
Verify compatibility with your specific system configuration before ordering.
| functional_description | SUPPORT THE SIXTH STAGE TURBINE DISK WHILE ITS STUB SHAFT DIAMETER IS MACHINED BEFORE AND AFTER PLASMA SPRAY |
| nominal_overall_height | 7.600 INCHES IN |
| end_item_identification | C-17 AIRCRAFT ENGINE F117-PW-100 |
| nominal_overall_diameter | 31.500 INCHES IN |
| reference_data_and_literature | SERD 0500 |
| NSN | 4920-01-394-1267 |
| NOMINAL OVERALL DIAMETER | 31.500 INCHES IN |
| REFERENCE DATA AND LITERATURE | SERD 0500 |
| NOMINAL OVERALL HEIGHT | 7.600 INCHES IN |
| FUNCTIONAL DESCRIPTION | SUPPORT THE SIXTH STAGE TURBINE DISK WHILE ITS STUB SHAFT DIAMETER IS MACHINED BEFORE AND AFTER PLASMA SPRAY |
| END ITEM IDENTIFICATION | C-17 AIRCRAFT ENGINE F117-PW-100 |
No substitute or cross-reference records for this part.