PWA71491: FIXTURE,ENGINE MAINTENANCE,AIRCR.
FIXTURE,ENGINE MAINTENANCE,AIRCR. Key specifications include special_features: FIXTURE INCLUDES 1 PRESSURE GAGE,1 ON/OFF VALVE, 1 BLEED VALVE. 1 PRESSURE RELEASE VALVE AND HANDLES, nominal_overall_width: 8.500 INCHES IN, specific_usage_design: LOCATE AND SECURE THE AIR TUBE ASSY DURING A 1000 PSI LEAK TEST TO ENSURE TUBE INTEGRITY AFTER WELD REPAIR, nominal_overall_height: 6.000 INCHES IN, nominal_overall_length: 17.000 INCHES IN, end_item_identification: F100-PW-100/200/220/220E AIRCRAFT ENGINE.
This part is cataloged in the U.S. Government catalog under NSN 4920-01-424-0456, indicating validated use in U.S. government and defense logistics supply chains.
Available through authorized enterprise resellers and TPM (Third Party Maintenance) channels. Verify compatibility with your specific system configuration before ordering.
| special_features | FIXTURE INCLUDES 1 PRESSURE GAGE,1 ON/OFF VALVE, 1 BLEED VALVE. 1 PRESSURE RELEASE VALVE AND HANDLES |
| nominal_overall_width | 8.500 INCHES IN |
| specific_usage_design | LOCATE AND SECURE THE AIR TUBE ASSY DURING A 1000 PSI LEAK TEST TO ENSURE TUBE INTEGRITY AFTER WELD REPAIR |
| functional_description | FIXTURE REQUIRED TO PRESSURE TESTTHE NUMBER 4 BEARING AIR SUPPLY TUBE ASSEMBLY AFTER WELD REPAIR OF A NEW REPLACEMENT FERRULE |
| nominal_overall_height | 6.000 INCHES IN |
| nominal_overall_length | 17.000 INCHES IN |
| end_item_identification | F100-PW-100/200/220/220E AIRCRAFT ENGINE |
| reference_data_and_literature | SERD 7781; TO 2J-F100-94 |
| NSN | 4920-01-424-0456 |
| NOMINAL OVERALL WIDTH | 8.500 INCHES IN |
| NOMINAL OVERALL LENGTH | 17.000 INCHES IN |
| REFERENCE DATA AND LITERATURE | SERD 7781; TO 2J-F100-94 |
| NOMINAL OVERALL HEIGHT | 6.000 INCHES IN |
| SPECIAL FEATURES | FIXTURE INCLUDES 1 PRESSURE GAGE,1 ON/OFF VALVE, 1 BLEED VALVE. 1 PRESSURE RELEASE VALVE AND HANDLES |
| SPECIFIC USAGE DESIGN | LOCATE AND SECURE THE AIR TUBE ASSY DURING A 1000 PSI LEAK TEST TO ENSURE TUBE INTEGRITY AFTER WELD REPAIR |
| FUNCTIONAL DESCRIPTION | FIXTURE REQUIRED TO PRESSURE TESTTHE NUMBER 4 BEARING AIR SUPPLY TUBE ASSEMBLY AFTER WELD REPAIR OF A NEW REPLACEMENT FERRULE |
| END ITEM IDENTIFICATION | F100-PW-100/200/220/220E AIRCRAFT ENGINE |
No substitute or cross-reference records for this part.