PWA70788: FIXTURE,ENGINE MAINTENANCE,AIRCR.
FIXTURE,ENGINE MAINTENANCE,AIRCR. Key specifications include special_features: INSTALL BLADES ONE AT A TIME ON FIXTURE O.D. UNTIL ALL BLADES ARE IN PLACE, INSTALL CLAMP RING AND SECURE, functional_description: LOCATE AND SECURE A COMPLETE SET OF -229 1ST STAGE TURBINE BLADES TO ACCOMODATE WATER JET REMOVAL OF BONDED VOLCANIC ASH, end_item_identification: F100-PW-229 ENGINE, reference_data_and_literature: SERD NO.
6804; T.O. 2J-F100-94. This part is cataloged in the U.S.
Government catalog under NSN 4920-01-381-1597, indicating validated use in U.S. government and defense logistics supply chains. Available through authorized enterprise resellers and TPM (Third Party Maintenance) channels.
Verify compatibility with your specific system configuration before ordering.
| special_features | INSTALL BLADES ONE AT A TIME ON FIXTURE O.D. UNTIL ALL BLADES ARE IN PLACE, INSTALL CLAMP RING AND SECURE |
| functional_description | LOCATE AND SECURE A COMPLETE SET OF -229 1ST STAGE TURBINE BLADES TO ACCOMODATE WATER JET REMOVAL OF BONDED VOLCANIC ASH |
| end_item_identification | F100-PW-229 ENGINE |
| reference_data_and_literature | SERD NO. 6804; T.O. 2J-F100-94 |
| NSN | 4920-01-381-1597 |
| REFERENCE DATA AND LITERATURE | SERD NO. 6804; T.O. 2J-F100-94 |
| SPECIAL FEATURES | INSTALL BLADES ONE AT A TIME ON FIXTURE O.D. UNTIL ALL BLADES ARE IN PLACE, INSTALL CLAMP RING AND SECURE |
| FUNCTIONAL DESCRIPTION | LOCATE AND SECURE A COMPLETE SET OF -229 1ST STAGE TURBINE BLADES TO ACCOMODATE WATER JET REMOVAL OF BONDED VOLCANIC ASH |
| END ITEM IDENTIFICATION | F100-PW-229 ENGINE |
No substitute or cross-reference records for this part.