PWA500051: TEST STATION,ELECTRICAL-ELECTRON.
TEST STATION,ELECTRICAL-ELECTRON. Key specifications include overall_width: 0.500 INCHES NOMINAL IN, overall_height: 16.000 INCHES NOMINAL IN, overall_length: 130.000 INCHES NOMINAL IN, fsc_application_data: MODEL FJ-43,AUGMENTOR SECTION, functional_description: PERFORM POST OVERHAUL TESTING, end_item_identification: F100-PW-100/200/220/220E/229 ACFT ENGINES. This part is cataloged in the U.S.
Government catalog under NSN 4920-01-144-1832, indicating validated use in U.S. government and defense logistics supply chains. Available through authorized enterprise resellers and TPM (Third Party Maintenance) channels.
Verify compatibility with your specific system configuration before ordering.
| overall_width | 0.500 INCHES NOMINAL IN |
| overall_height | 16.000 INCHES NOMINAL IN |
| overall_length | 130.000 INCHES NOMINAL IN |
| special_features | SMR CODE PEFFFU. T.O. 2J-F100-53-6 WP 702, 702 (DEPOT) VERTICAL; T.O. 2J-F100-56-6 WP 702, 702 (INTERMEDIATE)(VERTICAL); T.O. 2J-F100-56-5 WP 112, 114, 116 (INTERMEDIATE)(HORIZONTAL) |
| fsc_application_data | MODEL FJ-43,AUGMENTOR SECTION |
| functional_description | PERFORM POST OVERHAUL TESTING |
| end_item_identification | F100-PW-100/200/220/220E/229 ACFT ENGINES |
| reference_data_and_literature | T.O.33D4-6-587-1-1 |
| general_characteristics_item_description | AN INSULATING BLANKET IS REQUIRED TO RETAIN THE HEAT IN THE ENGINE PARTS, AND ALLOWS FOR QUICKER HEAT UP TIMES |
| NSN | 4920-01-144-1832 |
| FSC APPLICATION DATA | MODEL FJ-43,AUGMENTOR SECTION |
| REFERENCE DATA AND LITERATURE | T.O.33D4-6-587-1-1 |
| SPECIAL FEATURES | CONSISTS OF COMPUTER AND PERIPHERALS; INTERFACE EQUIPMENT; SOFTWARE PROGRAMS; MANUAL AND AUTOMATIC CONTROL; 245.000 IN L,168.000 IN W,108.000 IN H; 26,000 LBS LBS |
| FUNCTIONAL DESCRIPTION | PERFORM POST OVERHAUL TESTING |
| END ITEM IDENTIFICATION | F100-PW-100/200 ACFT ENGINE |