The PUMP,COOLING SYSTEM,ENGINE is a the manufacturer thermal management component critical for maintaining optimal operating temperatures in enterprise hardware. Key specifications include criticality_code_justification: ZZZY. This product is currently in active production with full OEM support.
This part is cataloged in the Federal Logistics Information System (FLIS) under NSN 5998-01-096-2838, indicating validated use in U.S. government and defense logistics supply chains. Available through authorized enterprise resellers and TPM (Third Party Maintenance) channels.
Verify compatibility with your specific system configuration before ordering.
| criticality_code_justification | ZZZY |
| reference_number_differentiating_characteristics | MATERIAL WILL BE IN ACCORDANCE WITH NAVAL INVENTORY CONTROL POINT, MECHANICSBURG, ACTIVITY HX QUALITY CONTROL, MANUFACTURING AND TESTING SPECIFICATIONS |
| NSN | 5998-01-096-2838 |
| SPECIAL FEATURES | PWB 1,RES 76,CAP 83,COIL 5,CRYSTAL 2,TRANSISTOR 18,MICROCIRCUIT 22,DIODE 6;2ND LO/BFO SYNTHESIZER |
| END ITEM IDENTIFICATION | R-2174(P)/URR RADIO RCVR |
| FEATURES PROVIDED | ELECTROSTATIC SENSITIVE |
| PRECIOUS MATERIAL AND LOCATION | TERMINALS PLATINUM |
| CRITICALITY CODE JUSTIFICATION | CBBL |
| SPECIAL FEATURES | PWB 1,RES 76,CAP 83,COIL 5,CRYSTAL 2,TRANSISTOR 18,MICROCIRCUIT 22,DIODE 6;2ND LO/BFO SYNTHESIZER |
| END ITEM IDENTIFICATION | R-2174(P)/URR RADIO RCVR |
| FEATURES PROVIDED | ELECTROSTATIC SENSITIVE |
| PRECIOUS MATERIAL AND LOCATION | TERMINALS PLATINUM |
| CRITICALITY CODE JUSTIFICATION | CBBL |
No verified substitutes available.