The 2915239 is a the manufacturer industrial component. Key specifications include special_features: KIT INCLUDES CONTROLLER NO. 1600364, HAS CAPABILITY TO UPGRADE SOFTWARE, end_item_identification: BOOM LIFT,SHIPBOARD MODEL 450A SERIES II A, part_name_assigned_by_controlling_agency: ADE GROUND CONTROL MODULE.
This part is cataloged in the U.S. Government catalog under NSN 5998-01-573-7333, indicating validated use in U.S. government and defense logistics supply chains.
Available through authorized enterprise resellers and TPM (Third Party Maintenance) channels. Verify compatibility with your specific system configuration before ordering.
WHERE IT FITS
MRO→MRO_GENERAL→2915239
NSN:5998-01-573-7333 FSC:5998 — Electrical and Electronic Assemblies, Boards, Cards, and Associated Hardware CAGE:1YHH8 — JLG INDUSTRIES, INC. (USA)
SPECIFICATIONS
special_features
KIT INCLUDES CONTROLLER NO. 1600364, HAS CAPABILITY TO UPGRADE SOFTWARE
end_item_identification
BOOM LIFT,SHIPBOARD MODEL 450A SERIES II A
part_name_assigned_by_controlling_agency
ADE GROUND CONTROL MODULE
NSN
5998-01-573-7333
COMPONENT DIAGRAM
TECHNICAL CHARACTERISTICS
SPECIAL FEATURES
KIT INCLUDES CONTROLLER NO. 1600364, HAS CAPABILITY TO UPGRADE SOFTWARE
PART NAME ASSIGNED BY CONTROLLING AGENCY
ADE GROUND CONTROL MODULE
END ITEM IDENTIFICATION
BOOM LIFT,SHIPBOARD MODEL 450A SERIES II A
OTHER ITEMS IN FSC 5998 — Electrical and Electronic Assemblies, Boards, Cards, and Associated Hardware
Items in the same Federal Supply class. No interchangeability or substitution relationship is implied.
As an eBay Partner, PartsTable may earn a commission. Your price is not affected.
FREQUENTLY ASKED QUESTIONS
What is 2915239?
2915239 is a 2915239. It is classified as a MRO (MRO_GENERAL).
What parts can replace 2915239?
There are 2 known substitutes for 2915239: 1600364, 2915014. Substitute compatibility should be verified for your specific system.
What is the NSN for 2915239?
2915239 is cataloged in the U.S. Government catalog under NSN 5998-01-573-7333. This indicates validated use in U.S. government and defense supply chains.
Community Feedback
Leave a Comment
Comments are reviewed before appearing. You will receive an email to verify before your comment appears.