PartsTable
Technical Data Sheet
Download PDF

1P0921 — LEVER,MANUAL CONTROL

✓ Government record, cited
— · COMPONENT
PRODUCT OVERVIEW

1P0921: LEVER,MANUAL CONTROL.

The LEVER,MANUAL CONTROL is a the manufacturer industrial component. This part is cataloged in the U.S. Government catalog under NSN 3040-01-252-9527, indicating validated use in U.S.

government and defense logistics supply chains. Available through authorized enterprise resellers and TPM (Third Party Maintenance) channels. Verify compatibility with your specific system configuration before ordering.

WHERE IT FITS
1P0921
NSN: 3040-01-252-9527
FSC: 3040 — Miscellaneous Power Transmission Equipment
CAGE: 11083 — CATERPILLAR INC DIV CATERPILLAR DEFENSE (USA)
SPECIFICATIONS
Part Number1P0921
NSN3040-01-252-9527
COMPONENT DIAGRAM
COMPONENT MAIN IC EDGE CONNECTOR No detailed specs available LEVER,MANUAL CONTROL TITLE COMPONENT PN 1P0921 MFR LEVER,MANUAL CONTROL
OTHER ITEMS IN FSC 3040 — Miscellaneous Power Transmission Equipment
Items in the same Federal Supply class. No interchangeability or substitution relationship is implied.
3040-00-001-0046 3040-00-001-0047 3040-00-001-0048 3040-00-001-0068 3040-00-001-0077 3040-00-001-0078 3040-00-001-0089 3040-00-001-1224
SUBSTITUTES & CROSS-REFERENCES 1
1P921Reference document
Same NSN cross-reference
Reference document — Secondary reference
LIFECYCLE
NSN statusActive· U.S. Government catalog
Acquisition advice: Normally procured from the manufacturer (OEM)No demilitarization required
Ready to buy 1P0921?
Compare prices from verified sellers on eBay
Buy on eBay →
As an eBay Partner, PartsTable may earn a commission. Your price is not affected.
FREQUENTLY ASKED QUESTIONS
What is 1P0921?
1P0921 is a LEVER,MANUAL CONTROL.
What parts can replace 1P0921?
There is 1 known substitute for 1P0921: 1P921. Substitute compatibility should be verified for your specific system.
What is the NSN for 1P0921?
1P0921 is cataloged in the U.S. Government catalog under NSN 3040-01-252-9527. This indicates validated use in U.S. government and defense supply chains.
Community Feedback
Leave a Comment
Comments are reviewed before appearing. You will receive an email to verify before your comment appears.

Request a Quote — 1P0921